Kit assembly, labelling and metro logistics.

Assembly
Hardware installation, sub-assembly and trial fitting can be completed before dispatch. Labels and packing lists align to your install sequence.
Large frames may be supplied in knocked-down form for galvanising or site access—confirm crane and aisle constraints early.
Packing
Stillages, timber cradles and bolted restraints suit metro freight. Vertical panels are separated to avoid coating rub-through.
Lifting lugs are added when weight exceeds safe manual handling.
Delivery
Metro delivery and pickup from Point Cook are available. Delivery windows should account for site induction and unloading equipment.
